Famous Floor Tile Access Panel Factories – Anti-static steel raised access floor with edge (HDG) – kehua

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With advanced technologies and facilities, strict high-quality handle, reasonable rate, superior services and close co-operation with prospects, we are devoted to furnishing the best price for our customers for Raised Concrete Floor, Data Center Raised Floor, Raised Access Floor System, We welcome new and old customers to contact us by phone or send us inquiries by mail for future business relationships and achieving mutual success.
Famous Floor Tile Access Panel Factories – Anti-static steel raised access floor with edge (HDG) – kehua Detail:

Product Introduction

All steel without border static floor choose thickened 1.2HPL veneer as surface layer (north anti-cracking 98% or more), electrostatic conductivity is good, and the use of thickened high quality steel plate, after stamping and welding (64 solder joints) for plastic treatment, and filled with foamed cement, making the edges of the steel floor hard, Greatly strengthen the bearing capacity of floor edge and flatness and adornment sex.

Architecture Description
Galvanized steel support structure combination mode can withstand 6500kGF failure strength. The beam is connected with the top of the bracket, and the thickness of the tube wall is 1.0mm. It can be replaced with each other and installed on the bottom side of the floor around. It has the strength of more than 300kGF, and can achieve the characteristics of stable structure and convenient wiring maintenance.

Cladding material

The company uses thickened 1.2HPL surface material to solve the surface cracking phenomenon caused by dry temperature difference in northern climate.

Features

Steel, large bearing capacity, strong impact resistance.
Inside filled with special foam cement, comfortable and stable, sound absorption, heat insulation and fire performance.
All raw materials have excellent antistatic properties, so that the performance of the floor system is stable and reliable.
The decorative surface of all steel floor is made of HPL decorative surface with electrostatic dissipation.  Floor mechanical performance super.
The floor is decorated with black electrostatic guide strip, which further strengthens the anti-static function of the system and makes the appearance more beautiful. Decorative surface wear resistance, fire performance and other aspects better.   

Application

Widely used in electronic computer rooms, satellite ground station room, radio control room, control room, television station microwave station computer room, program-controlled exchange room, clean workshop, electronic instrument factory assembly shop, confidential optical instrument manufacturing workshops, hospitals, schools and other places that have requirements of anti-static requirements, the electronic computer is big, medium-sized machine room, represented by exchange of communication room, computer room.


5ed1bc47baf2f


5ed1bc4cea28d

Performance select chart

Type Specification Concentrated Load(N) Impact Load(N) Ultimate Load(N) Untimate Load(N/m2) Dynamic Load(N) Fire Protection System resistance
International National LB N KG 10 10000
FS500 HDG(CQ) 600x600x30 500 1960 200 295 5880 9720 1958 1566 A 1×106Ω~1×109Ω
FS700 HDG(Q) 600x600x35 700 2950 318 550 8850 12500 3110 2220 A
FS800 HDG(P) 600x600x35 800 3560 363 670 10700 17000 3560 2670 A
FS1000 HDG(B) 600x600x35 1000 4450 453 670 13350  23000 4450 3560 A

Product detail pictures:

Famous Floor Tile Access Panel Factories –  Anti-static steel raised access floor with edge (HDG) – kehua detail pictures


Related Product Guide:

We are experienced manufacturer. Wining the majority of the crucial certifications of its market for Famous Floor Tile Access Panel Factories – Anti-static steel raised access floor with edge (HDG) – kehua , The product will supply to all over the world, such as: Cannes, Afghanistan, Ecuador, Customer satisfaction is our first goal. Our mission is to pursue the superlative quality, making continual progress. We sincerely welcome you to make progress hand in hand with us, and construct a prosperous future together.
  • The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Patricia from Johannesburg - 2017.10.25 15:53
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Odelia from Bolivia - 2017.03.07 13:42
    Write your message here and send it to us